September 2011
- Alton, The Star: Phase two of development work has now begun. The Club will install 22 hardstanding pitches and water drainage to the staff pitches
- Blackmore: conversion of 63 plastic honeycomb pitches to hardstandings
- Glencoe: drainage to the camping area
- Mablethorpe: installation of a new play area
- Slapton Sands: refurbishment of the pump wells
- Graffham: the addition of staff pitches and a bin store area
- Kelvedon Hatch: 18 hardstanding pitches with hook-ups added
- Kendal: five hardstandings with hook-ups and a new septic tank added
- Kessingland: the replacement of a damaged disabled toilet floor
- Sandringham: the replacement of a path to the reception area and refurbishment of the site’s service areas,
- Veryan: the replacement of a water storage tank