September 2011

  • Alton, The Star: Phase two of development work has now begun. The Club will install 22 hardstanding pitches and water drainage to the staff pitches
  • Blackmore: conversion of 63 plastic honeycomb pitches to hardstandings
  • Glencoe: drainage to the camping area
  • Mablethorpe: installation of a new play area
  • Slapton Sands: refurbishment of the pump wells
  • Graffham: the addition of staff pitches and a bin store area
  • Kelvedon Hatch: 18 hardstanding pitches with hook-ups added
  • Kendal: five hardstandings with hook-ups and a new septic tank added
  • Kessingland: the replacement of a damaged disabled toilet floor
  • Sandringham: the replacement of a path to the reception area and refurbishment of the site’s service areas,
  • Veryan: the replacement of a water storage tank