Improvement to road conditions at Woodhall Spa

Improvement to road conditions at Woodhall Spa

After surviving the wettest summer in 100 years the Club has continued to improve its site network in 2013.

Here’s a list of the latest completed work:

  • Cambridge: A spur road has been installed to provide access to the additional field
  • Ebury Hill: A new backpacker building has been installed
  • Folkestone: Fencing has been installed around the cliff edge and around selected pitches
  • Hertford: The site roads have been rerolled and graded to remove potholes
  • Milarrochy Bay: The site roads have been rerolled and graded to remove potholes
  • Sennen Cove: Heating has been installed in the site amenity blocks
  • Windermere: Overhauled all drainage to site to alleviate flooding
  • Woodhall Spa: The site roads have been rerolled and graded to remove potholes
  • Canterbury: Work is complete! Two amenity blocks have undergone refurbishment and tarmac repairs have been undertaken.
  • Keswick: The site has seen the installation of new hardstanding pitches and the site entrance has been reconfigured with a new barrier and motorhome service point. It has also received an electrical upgrade.
  • Lauder: The self-catering Lodges have been refurbished
  • Walton on Thames: The site’s roads and approach lane have been resurfaced. A new reception area has been in installed plus the service areas and the chemical disposal point has been refurbished.
  • Sheriff Hutton: The approach road and site roads have been resurfaced.
  • West Runton: Heating has been installed in the amenity blocks
  • Delamont Country Park: The site has seen the installation of hardstanding pitches and land drainage has been installed.
  • Kelvedon Hatch: An electrical upgrade has been undertaken.
  • Tregurrian: An electrical upgrade has been undertaken.
  • Sandringham: Work is in progress to install new hardstanding pitches. The site has also received an electrical upgrade.